Yauhen Shastala · Timwerk B2B

Independent Carpentry & Interior Finishing Subcontractor

Professional carpentry, aftimmerwerk, interior renovations and installation work for construction and renovation companies in the Breda region.

Independent ZZPOwn van & toolsVCA & GPIBreda +35 km
Yauhen Shastala installing and aligning a window frame in Dordrecht
Dordrecht · KozijnenmontagePrecise installation on site

Services

Available for execution and finishing work.

Carpentry and interior finishing for construction and renovation companies.

Carpentry & interior finishing

Interior finishing, doors, wall and ceiling work, custom details and precise installation of interior components.

Interior renovation & installation

Installation and finishing for residential and commercial renovation projects, including prefab and interior components from drawings.

Technical execution & coordination

Checking dimensions, technical drawings and interfaces. Identifying issues early and coordinating them with the construction team.

Timber framing and façade cladding on a new chalet at Bouw & Interieur op Maat
New chalet construction — timber framing and façade cladding.

Experience & expertise

Hands-on capability. Technical awareness.

Around 15 years of experience in construction, carpentry and installation — from millimetre-precise detailing to coordinating assigned sections or specific work activities across the construction site.

My international experience includes complex door systems, prefab and timber structures, residential construction and concrete works on large-scale projects.

I work independently within a clear scope, check drawings and dimensions and raise technical issues with the construction team in good time.

Yauhen ShastalaTimwerk

Reviews & recommendations

LinkedIn · BOERPlay

“yauhan is a skilled and reliable worker”

Selected projects

Beyond the hands-on work.

From window and precision door installation to coordinating construction work. This is the experience I bring to every job.

The NetherlandsCarpenter
Carpentry, frame installation, modular construction and timber structures.

From most recent to earlier assignments

  1. Staton Bouw

    Window frame installation

    On-site installation and accurate positioning of window frames.

    Project photos (1)
    Staton Bouw — Window frame installation — 1
  2. BOERPlay

    Solid timber construction

    Fabrication and assembly of solid timber playground structures from technical drawings.

    Project photos (2)
    BOERPlay — Solid timber construction — 1BOERPlay — Solid timber construction — 2
  3. Bouw & Interieur op Maat

    New chalet construction — carpentry & finishing

    Carpentry and finishing work on new chalets. Wall installation, floor insulation and construction of insulated flat roofs. Plasterboard installation, finish carpentry and painting. Installation of doors and window frames. Façade work including timber framing and decorative timber cladding.

    Project photos (4)
    Bouw & Interieur op Maat — New chalet construction — carpentry & finishing — 1Bouw & Interieur op Maat — New chalet construction — carpentry & finishing — 2Bouw & Interieur op Maat — New chalet construction — carpentry & finishing — 3Bouw & Interieur op Maat — New chalet construction — carpentry & finishing — 4
  4. Nieuwenhuis

    Foundation work & formwork

    Foundation work, including assembly and installation of formwork.

    Project photos (3)
    Nieuwenhuis — Foundation work & formwork — 1Nieuwenhuis — Foundation work & formwork — 2Nieuwenhuis — Foundation work & formwork — 3
  5. Moeskops’ Bouwbedrijf BV

    Timber subframe installation

    Assembly and installation of timber subframes for large window and door openings providing balcony access.

    Project photos (1)
    Moeskops’ Bouwbedrijf BV — Timber subframe installation — 1
  6. Barli

    Modular home installation

    Installation of modular homes on the construction site.

    Project photos (6)
    Barli — Modular home installation — 1Barli — Modular home installation — 2Barli — Modular home installation — 3Barli — Modular home installation — 4Barli — Modular home installation — 5Barli — Modular home installation — 6
  7. DTM Modular Construction

    Aftercare & warranty repairs

    Minor repairs and remedial work as part of warranty service and aftercare.

  8. HomesFactory

    Prefab production & home assembly

    Production of wall and roof elements from technical drawings. Installation of formwork and reinforcement for concrete floors. Setting out and installing walls on concrete floors, assembling pitched roofs and installing internal partitions. Installation of timber framing and decorative timber cladding.

    Project photos (6)
    HomesFactory — Prefab production & home assembly — 1HomesFactory — Prefab production & home assembly — 2HomesFactory — Prefab production & home assembly — 3HomesFactory — Prefab production & home assembly — 4HomesFactory — Prefab production & home assembly — 5HomesFactory — Prefab production & home assembly — 6
PolandSite Supervisor
Residential construction: supervision of assigned sections or specific work activities across the site.
PolandSite Supervisor — residential construction

Residential projects: 200–300 apartments

Supervision and coordination of subcontractors within my assigned scope, from earthworks through the handover of apartments to buyers.

Full construction cycleSubcontractorsPlanning
Work & responsibilities
  • Supervising and coordinating subcontractors for an assigned section or specific work activities across the construction site.
  • Coordinating additional site-wide tasks with colleagues and my direct supervisor.
  • Determining formwork requirements with PERI and coordinating its rotation between construction phases while reducing excess rented equipment.
  • Checking formwork invoices and, when required, obtaining alternative quotations for price discussions.
  • Coordinating with the concrete plant, preparing pour schedules and maintaining concrete pour records.
  • Working with an independent laboratory to monitor concrete quality and liaising with equipment rental companies.
  • Identifying errors and ambiguities in drawings and coordinating formal clarification with designers within my area of responsibility.

The figure of 200–300 apartments describes the scale of the projects. Depending on the assignment, I was responsible for an assigned section or for specific work activities across the construction site.

BangladeshSite Supervisor
Concrete works on a nuclear power plant construction project.
BangladeshSite Supervisor — concrete works

Concrete works on a nuclear power plant project

Supervision of reinforcement, formwork and concrete pouring, with close attention to preparation and work sequencing.

Reinforcement & formworkConcrete pouringForward planning
Work & responsibilities
  • Supervising reinforcement, formwork and concrete works.
  • Planning upcoming work and ensuring materials were available on time.
  • Identifying material shortages and questions in working drawings at an early stage.
  • Resolving issues within my authority or escalating them to management in good time.

Depending on the assignment, I was responsible for an assigned section or for specific work activities across the construction site.

BelarusDoor installer
Precision installation of doors and specialist door systems.
BelarusDoor installer

Door systems requiring precision fitting

Installation of interior doors with a range of systems. All machining and fitting work was completed on the customer’s premises.

Concealed doorsFolding doorsPivot systems
Work & responsibilities
  • Installing interior doors, including concealed, folding and pivot systems.
  • Routing and fitting hinges, locks and other door hardware.
  • Cutting and precisely fitting frames, architraves and extension jambs.
  • Hanging, aligning and adjusting doors on site for a precise finish.

These projects represent my personal professional experience, including work completed before Timwerk was established. The photographs show selected examples and do not define the full range of my skills.

Equipment & site readiness

Fully Equipped. Ready to Work.

Independent carpentry subcontractor with my own work van, professional tools and relevant site safety certifications.

01

Own work van

For transporting tools, equipment and standard work materials.

02

Professional equipment

My own carpentry, installation and measuring tools for precise execution.

03

Safety & insurance

VCA, GPI and professional liability insurance. Documents are available during project intake.

Working together

Clear scope. Independent execution.

Available as an independent ZZP subcontractor for clearly defined work. Available for individual projects and long-term cooperation. We agree on the schedule and duration together.

Working area: Breda +35 km. Up to 50 km for suitable projects.
01

Define the assignment

Scope, location and technical expectations.

02

Align the planning

Start date, site access, safety and coordination.

03

Independent execution

Clear communication on progress and technical issues.

Direct contact

Discuss your project.

Send the location, scope of work and expected start date. You discuss the assignment directly with me.

Please include the location, scope of work and expected start date.
Working area: Breda +35 km. Up to 50 km for suitable projects.

Message Yauhen